Projects
Fabrication Work
Our fabrication shop has been absolutely slammed for the last year and we have produced some great equipment/fabricated parts. We are starting to see some space in our schedule. Accurity Industrial Contractors, LLC. fabrication shop in Owensboro has 35,000 sqft of...
Installing stiffeners to the exterior casing
Accurity Industrial Contractors, llc. was recently hired to install additional stiffeners to the exterior casing to help increase the available back pressure on 3 Nooter/Eriksen, Inc. HRSG's. This project shows the depth of the Accurity Industrial Contractors,...
HRSG Drains
Toward the end of 2022 Accurity Industrial Contractors, llc. was awarded the fabrication and installation of small bore drains on 12 Amec Foster Wheeler HRSG units. This project will be done over the next 4 years. Turn key projects like this are our bread and...
Piping, Piping & More Piping
This outage season is all about piping, large bore, small bore, high energy piping, Stainless piping, valves, sockets, couplings, manifolds, if it has to due with tubing or piping we are doing some form of it this spring. What kind of piping can Accurity Industrial...
Stainless Piping
It is amazing to me how much Stainless piping we do in the field. This is some underground piping we doing at a new local paper mill going in. What can Accurity Industrial Contractors, LLC. help you with today? #stainlesssteelpipe
Attemperator Repair
Are you finding cracks around the spray nozzle area? If not you probably haven't checked them lately, Ha Ha!! Attemperators are a hot spot in the HRSG world, and at Accurity Industrial Contractors, LLC. we have gotten pretty good at repairing them. Lets talk about...
Outage Season
With Fall outage season fast approaching Accurity Industrial Contractors, LLC. still has manpower available, but we won't for long so if you need a professional Industrial/Mechanical contractor to take care of your piping, welding, ASME code, equipment setting, or...
Need Tube Welders?
Accurity Industrial Contractors, LLC. was asked to help install 107 - 2.5" tubes in a Babcock & Wilcox coal fired boiler. The project consisted of the removal the tubes from the header on the bottom and butt weld joints on top of the slope wall in the wet...
Drumming Up Some Business
Accurity Industrial Contractors, LLC. was asked to assist in the inspection of downcomer nozzles in a Nooter/Eriksen, Inc. HP steam drum. We had to remove the belly pans and clean up the welds for inspection. How can Accurity Industrial Contractors, LLC. help you...
Stacking Parts
Accurity Industrial Contractors, LLC. fabrication shop has been turning out some very nice structural components. But that's not all we can do, if you have piping, tanks, ductwork, boiler components, tubing etc.... we can make it happen. How can Accurity Industrial...
Outages, Outages, Outages!!
What a busy outage season by the end of May we will have been in 20 different industrial plants, worked on 23 boilers in 7 different states, and fabricated more parts than our fabrication shop has ever turned out. What a great spring for Accurity Industrial...
P-91 Valve Remove and Replacement
Accurity Industrial Contractors, LLC. is a specialty welding company. We are good at welding the harder to weld materials, in this photo one of our welders is welding some 16" x 2" thick P-91 Valves and spool piece together before it gets set in place on the top of...