Projects
High Energy Piping
Repair, Replacement or fabrication of P91, P9, P5, P22, P11 (SA335) material is one of specialties, and we are good at it!! When you need special attention paid to your high maintenance piping Accurity Industrial Contractors will get it done right for you every time.
SCR frame remove and replace.
Accurity Industrial Contractors, LLC. was recently hired to remove and reinstall an SCR frame that had been damaged inside a Nooter/Eriksen, Inc. HRSG. This job required the removal of 40 Cormetech catalyst blocks, the removal of structural beams, casing and lining...
All Sealed up!!
Accurity was hired by DEKOMTE de Temple Expansion Joint Technology to perform the mechanical portion of HRSG penetration seals on 4 different Nooter/Eriksen, Inc. HRSG units in 2 different plants, 1 in South Carolina and 1 in Arkansas. Accurity successfully...
All Burnt up!!
Accurity was hired to remove and replace 2 Coen duct burner elements in a Nooter/Eriksen, Inc. HRSG. The crew did so well we where able to install an additional burner into the outage window that wasn't planned. Great job guys!!
HRSG Pipe Penetration seals
Accurity was hired to perform the mechanical installation portion of 36 - HRSG penetration seals, 2 - Combustion Turbine to HRSG expansion joints and the installation of a dust cover over one of the expansion joints. The work took place in the Carolinas and was...
Distillery Piping
Accurity was hired to install a rail loader/unloader for a local Distillery. These rail loaders will allow the transfer of product to and from the facility to and from rail. Accurity also installed the piping associated with it. What can Accurity do for you today?
Emergency!
Accurity was hired to perform an emergency tube leak on P-91 piping, that required heat treating, NDE, mirror welding, gas baffle repair, and even some duct burner repairs. Our customers where very pleased with our rapid response and ability to get the repairs done...
Do you need air?
Accurity was hired to install a compressor system that required installation of this 10,000 lb receiver tank, and 3 other receiver tanks, over 500' of 3", 4", and 6" air lines, over 100 valves, 3 mist eliminators, 3 new dryers, duct work for exhausting and roof...
Stainless is our game!
Accurity was hired to install a Quick Change flow panel in a local distillery. The work required the setting of the flow panel, welding of 400' of - 2" sanitary stainless tubing and installation of the pressure switches. The tubing had to be fusion welded. How can...
Staying Cool this summer!
The chill water system we did this spring with all the insulation on ready to keep things cool this summer.
Get In My Belly!
Accurity was recently hired to remove and replace belly pans in a Nooter Eriksen High Pressure steam drum. The belly pan connections had become loose and the belly pans had started to become distorted and warped. Accurity completely removed the belly pan, assisted...
Outage Season Part 2
Accurity was hired to perform the removal and replacement of 2 - 16" sch 160 P-91 Non Return Valves on a Nooter/Eriksen HRSG during an outage this Spring. The job included: the cutting out of the old valves rigging and installation of the new valves welding,...