Projects
Emergency!
Accurity was hired to perform an emergency tube leak on P-91 piping, that required heat treating, NDE, mirror welding, gas baffle repair, and even some duct burner repairs. Our customers where very pleased with our rapid response and ability to get the repairs done...
Do you need air?
Accurity was hired to install a compressor system that required installation of this 10,000 lb receiver tank, and 3 other receiver tanks, over 500' of 3", 4", and 6" air lines, over 100 valves, 3 mist eliminators, 3 new dryers, duct work for exhausting and roof...
Stainless is our game!
Accurity was hired to install a Quick Change flow panel in a local distillery. The work required the setting of the flow panel, welding of 400' of - 2" sanitary stainless tubing and installation of the pressure switches. The tubing had to be fusion welded. How can...
Staying Cool this summer!
The chill water system we did this spring with all the insulation on ready to keep things cool this summer.
Get In My Belly!
Accurity was recently hired to remove and replace belly pans in a Nooter Eriksen High Pressure steam drum. The belly pan connections had become loose and the belly pans had started to become distorted and warped. Accurity completely removed the belly pan, assisted...
Outage Season Part 2
Accurity was hired to perform the removal and replacement of 2 - 16" sch 160 P-91 Non Return Valves on a Nooter/Eriksen HRSG during an outage this Spring. The job included: the cutting out of the old valves rigging and installation of the new valves welding,...
Outage Season Part 1
Accurity is supporting 3 back to back outages for our customers on HRSG's. Outage #1 - Provide replacement of 25 #thermowells, from Stainless to P-91, remove creep in the heat affected zone of 3 - 16" x 10" WOL's, and provide other miscellaneous valve replacement...
New Chilled Water System
Accurity was hired to install a new chilled water system at a local manufacturer. This capital project included installing cooling towers, over 9,000 feet of welded and Victaulic connected pipe(20" to 2") and setting pumps & motors. The project also included...
Central Indiana Power Plant
Accurity was contacted by a central Indiana power plant to provide support during there fall outage. The work was mainly on there 2 Nooter Eriksen HRSG boilers. We installed 23 valves from 3/4" to 6", repaired sparging nozzles in the condenser, re-routed drain...
Reheat Tubes
Accurity was hired to remove and replace 90 - 2.5" reheat tubes in a coal fired boiler in Western Kentucky. Here is a little photo of those tubes.
High Speed, Low Drag
One of our High Speed, Low Drag welders getting down on some T-22 Mirror welding!! What can Accurity do for...
Christmas, Egg Nog & Stainless Tanks
Do you have any Christmas traditions? One of our family's is having a glass of Eggnog and Bourbon with a little bit of Nutmeg. Hopefully this year if you partake the bourbon may have come out of of a tank Accurity built. Check out these alcohol storage tanks we...