Accurity was hired to remove and replace 2 Coen duct burner elements in a Nooter/Eriksen, Inc. HRSG. The crew did so well we where able to install an additional burner into the outage window that wasn’t planned. Great job guys!!
Accurity was hired to perform the mechanical installation portion of 36 – HRSG penetration seals, 2 – Combustion Turbine to HRSG expansion joints and the installation of a dust cover over one of the expansion joints. The work took place in the Carolinas...
Accurity was hired to perform an emergency tube leak on P-91 piping, that required heat treating, NDE, mirror welding, gas baffle repair, and even some duct burner repairs. Our customers where very pleased with our rapid response and ability to get the repairs done in...
Accurity was recently hired to remove and replace belly pans in a Nooter Eriksen High Pressure steam drum. The belly pan connections had become loose and the belly pans had started to become distorted and warped. Accurity completely removed the belly pan, assisted the...
Accurity is supporting 3 back to back outages for our customers on HRSG’s. Outage #1 – Provide replacement of 25 #thermowells, from Stainless to P-91, remove creep in the heat affected zone of 3 – 16″ x 10″ WOL’s, and provide other...