Repair, Replacement or fabrication of P91, P9, P5, P22, P11 (SA335) material is one of specialties, and we are good at it!! When you need special attention paid to your high maintenance piping Accurity Industrial Contractors will get it done right for you every...
Accurity was hired to perform the mechanical installation portion of 36 – HRSG penetration seals, 2 – Combustion Turbine to HRSG expansion joints and the installation of a dust cover over one of the expansion joints. The work took place in the Carolinas...
Accurity was hired to install a Quick Change flow panel in a local distillery. The work required the setting of the flow panel, welding of 400′ of – 2″ sanitary stainless tubing and installation of the pressure switches. The tubing had to be fusion...
Accurity was recently hired to remove and replace belly pans in a Nooter Eriksen High Pressure steam drum. The belly pan connections had become loose and the belly pans had started to become distorted and warped. Accurity completely removed the belly pan, assisted the...
Accurity was hired to perform the removal and replacement of 2 – 16″ sch 160 P-91 Non Return Valves on a Nooter/Eriksen HRSG during an outage this Spring. The job included: the cutting out of the old valves rigging and installation of the new valves...
Accurity was contacted by a central Indiana power plant to provide support during there fall outage. The work was mainly on there 2 Nooter Eriksen HRSG boilers. We installed 23 valves from 3/4″ to 6″, repaired sparging nozzles in the condenser, re-routed...